UR-EKA LIGTHING AND CONTROLS LTD

Wakefield Fire Station – Wakefield

Using Calima R UGR<19 Recessed Fittings, a Full Lighting and Controls design with an emergency ūüÜė override on, of the Flex 7 control system using the fire panel #lightingdesign¬†#firestation¬†#flex7¬†#lightingcontrol¬†#lightingconsultant

Flex7 Ltd Northcliffe Lighting Limited Colin Shockledge

star_rate
  • Client: Murray Building Services Ltd
  • Date: June 2020
  • Location:¬†Wakefield, Yorkshire
  • Lighting: Recessed Calima R UGR<19 Panels, Crux Downlights, complete with a full Flex 7 Lighting control systems to override the lights on when the Fire Panel is activated
  • Project Value:¬†¬£50k
  • Company URL: Landing Page – Murray Building Services
star_rate
Other Example Projects
Menu